-0.3 C
Georgia
Friday, February 6, 2026

Tbilisi: Mayor inspects new kindergarten

Kakha Kaladze the Mayor of the Tbilisi city of the Republic of Georgia, inspected the newly rehabilitated N89 Kindergarten.

- Advertisement -spot_img
- Advertisement -spot_img

Kakha Kaladze the Mayor of the Tbilisi city of the Republic of Georgia, inspected the newly rehabilitated N89 Kindergarten. He was accompanied by many other representatives and officials of the city hall during his visit to the school.

Tbilisi Mayor Kakha Kaladze and Kakha Abuladze, Head of Kindergarten Management Agency also held an interaction with the staff and children of schools.

It is to be added that the updated infrastructure and yard a new wing and an additional four educational groups have been established after the completion of rehablitation work at the public kindergarten N89.

Speaking specifically on the occasion Kakha Kaladze added “We all saw in the photos what condition the 89th kindergarten was in the past time and how it had been changed with the effort of the present government. Presently, we have a modern garden of European standards. In addition to the rehabilitation a new wing was built and the garden can accommodate up to 500 children”.

He also stated that “ Currently, almost 460 children are registered in the school. The environment is very pleasant, there is also a beautiful courtyard which has been fully rehabilitated and attractions have been placed on different points. We are trying our best to introduce this standard everywhere which we have in recent years in the direction of infrastructure. Moreover our children the future generation are a priority and we will do everything to ensure that they have the opportunity to develop in a normal environment for full-fledged growth”.

It is to be added that the N89 nursery building was in a state of severe disrepair before rehabilitation work was carried out by authorities. At the same time under the framework of the project a certain part of the building was dismantled with the aim of building a new wing.

Similarly four more educational groups were added to the 12-group kindergarten. The building is equipped with child safety standards including – fire protection and video surveillance systems which have been already installed. The project was financed with 4,408,895 GEL from the budget of Tbilisi Kindergarten Management Agency.

- Advertisement -spot_img
Latest news
- Advertisement -
Related news
- Advertisement -

situs slot gacor

situs judi bola

slot 5k

slot777

clickbet88

mahjong

slot server thailand

bonus new member

slot bet 200

joker gaming

cmd368

ibcbet

bonus new member 100

rtp slot gacor

princess slot

slot depo 5k

slot spaceman

spbo

aresgacor

situs slot gacor

spaceman slot

bonus new member 100

slot gacor deposit pulsa

rtp slot gacor hari ini