20.8 C
Georgia
Saturday, June 21, 2025

Georgia: Construction work begins in Adjara

As per the officials of the Adjara local governmentn construction works of the modern water and irrigation system project are going to begin in Adjara. The cost of the large-scale infrastructure project is about 100 million euros. This was disclosed by officials at a recently concluded meeting.

- Advertisement -spot_img
- Advertisement -spot_img

As per the officials of the Adjara local governmentn construction works of the modern water and irrigation system project are going to begin in Adjara. The cost of the large-scale infrastructure project is about 100 million euros. This was disclosed by officials at a recently concluded meeting.

The Contract for the construction of the historical project was officially signed. Under the scope of the project the people of 39 villages and villages of Adjara will benefit from modern standards, uninterrupted water supply and managed irrigation infrastructure.

The project has plans to build water supply on main sites along with highway networks, reservoirs, sewer treatment sites, water supply networks, laboratories and administrative buildings of municipal water supply enterprises.

Construction works will start simultaneously in all municipalities of Ajara, and these villages of the cities will be included in the system of new, modern standards of construction that will be carried out step by step. As a result in 2024 at the first stage ten villages of three municipalities will get the benefits from 24-hour water supply.

At the same time within the framework of the construction work in 2024 the projects that will be built include ten water supply top dumps, 137 km long water supply pipes, nine reservoirs, seven water supply treatment bins, 978 water supply special pits (septic), five water supply company offices.

For the implementation of the “Adjara Water Alliance”, municipal water supply plants were created. Similarly 22 special equipment have been purchased which are already deployed in municipalities.

The Adjara government and the Adjara Water Alliance is implementing the Adjara water supply and irrigation project, which is co-financed by the Federal Republic of Germany within the framework of the support of KfW Bank and the European Union.

The basic needs of the water supply will be fulfilled on a priority basis as per the officials of the Adjara administration as well. The official said that the demand of people for pure and clean water supply will be fulfilled as soon as possible.

- Advertisement -spot_img
Latest news
- Advertisement -
Related news
- Advertisement -

mahjong slot

spaceman pragmatic

situs judi bola

Situs slot bet 100

slot 10 ribu

slot bonus new member

slot777

slot nexus

server thailand

joker123

rtp

olympus slot

https://indianbayleafrestaurant.com/

slot bet 200

slot

Ceriabet

ceriabet

Slot Mahjong

situs slot bet 100

https://kkci.online/

slot deposit 10 ribu

slot 10 ribu

sbotop login

slot777

aresgacor

situs slot gacor

slot spaceman

spaceman slot

bonus new member 100

slot gacor deposit pulsa

rtp slot gacor hari ini

slot deposit 5000 tanpa potongan

slot spaceman

slot qris

slot777

clickbet88

mahjong

bonus new member